OUR PROJECTS
Specialists In Demolition
SOS Corp. Construction has handled countless projects since our inception in 1990. Below are just a handful of some of our most prolific clients who have helped jettison SOS Corp. into the arena of larger clients and more complex jobs. A few of our most well-known clients right in our own backyard include: TD Garden, Fenway Park, and Mass General Hospital. However, we also tackle projects far outside of home state. Some of our traveling projects include are the West Point Military Academy Building 757, Renaissance Providence Hotel, and the New York Capitol Building in Albany, NY.
West Point Military Academy Building 757
— Highlands, NY
West Point decided to convert the former site of its campus library, which had been relocated, into this state-of-the-art science and research center. SOS Corporation gutted the interior leaving the structural walls in place.
Capitol Building Restoration
— Albany, NY
The State of New York’s historic Capitol Building (1867-1899) was plagued by long-term water infiltration issues, and SOS Corporation was involved with the renovation of the building to its original glory, inside and out.
Massachusetts General Hospital
— Boston, MA
SOS Corporation has participated multiple times at this facility for different general contractors. Renovation has been ongoing for 7 – 8 years. Combining demolition and cleaning to select areas throughout this occupied building, SOS is the demolition vendor of choice due to its reputation for meeting hospital standards, safety, cleanliness and professionalism.
Lahey Clinic
— Burlington, MA
SOS Corporation continues to participate with selective and structural demolition of operating rooms and removing pre-cast panels from the exterior in this ongoing renovation project. This is a working hospital, so SOS’s “clean-as-you-go” standard is critical to maintaining hospital activities.
Renaissance Providence Hotel
— Providence, RI
This conversion of a 1930 Masonic Temple to a hotel required careful demolition, removing only the steel and concrete flooring from 12 stories. SOS Corporation cleaned out the entire structure, leaving the original three sides of the building intact for contractor renovation.
Green Monster Seats, Fenway Park
— Boston, MA
When the idea was hatched to have seats at the Green Monster Wall, the area had to be prepared for building. SOS Corporation stepped in to dismantle that portion of Fenway Park’s left field wall, removing signage that was there and preparing the wall for erecting and tying in new steel for the seats. SOS kept to the quite intensive schedule so the entire job could be done between seasons.
Convention Center
— Boston, MA
Known for its sparking glass walls and gleaming floors, the Convention Center with its 700 guest rooms had to radiate perfection for its 2006 opening. SOS Corporation was there, cleaning each section meticulously as it became ready for occupation and keeping everyone’s timetable on the mark.
TD Garden
— Boston, MA
Cleaning 19,600 seats, 34 restrooms, 108 suites and 36 concession stands right after construction, not to mention 7 elevators and 13 escalators, it was a dirty job — but someone had to do it! SOS Corporation did it with pride, getting the entire building spic-and-span for its opening.
John F. Kennedy Memorial Middle School
— Waltham, MA
School was closed for the kids but not for SOS as this middle school got a much needed face lift. SOS Corporation took down portions of the building and gutted the interior, leaving nothing but hallway and structural walls. Multiple mobilizations were needed on this project as it stretched out over a year.
Fenway Triangle Apartments
— Boston, MA
This distinctive upscale apartment building became filled as soon as each apartment was ready, and SOS Corporation was there, ensuring spotless interiors and dazzling common areas. Fitting seamlessly into the construction schedule of these 570 units, SOS got in and got out quickly and efficiently, allowing maximum occupancy in the shortest amount of time.
TESTIMONIALS
We use SOS Corporation for their final cleaning services. They’ve done apartment buildings for us, along with a new inpatient facility at Boston City Hospital . They do an outstanding job.
Corderman engages SOS essentially in a partnership for demolition, final cleaning, and/or outsourced labor. We’ve worked with SOS for four years, and I worked with them ten years before that. We’ve been very satisfied with all of their work.
We use SOS Corporation for their final cleaning services. They’ve done apartment buildings for us, along with a new inpatient facility at Boston City Hospital . They do an outstanding job.